Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

BUILT TO FAIL

出版日期:
2024/01/15
9
1,1401,026
此為POD隨需印刷,是出版社高階列印輸出作品後逐本裝訂成冊,印刷及裝訂與傳統印刷品質不同,版權合法不影響閱讀。需等待21個工作天(不含例假日),建議和其他商品分開下單。
查詢門市庫存

內容簡介

The construction industry is as big as it is important. Without construction, our society would cease to be. We would have no ports, roads, or bridges. No communications networks, power grids, or water systems. No hospitals. No schools. No homes.

But we can barely get anything built. Capital projects are routinely finished late and over budget. Everyone acknowledges the problem, but no one seems to have the vision, or the will, to fix it.

The problem is the separation of "planning" from "doing" that has taken place over the last century. A misplaced focus on administration has marginalized the tasks of designing and building, which are the essence of construction.

New techniques and cutting-edge technology provide us with a different way of doing things. This is not mere theory; as author Todd Zabelle demonstrates, his company and other innovative firms are doing it now. But because too many construction professionals are set in their ways or are profiting from an ineffective system, nothing changes.

By drawing on operations science and focusing on the critical aspects of construction and on how we design, make, and build instead of administration, we can fix what has dogged the industry for decades while expanding the bottom line of owners, investors, and construction managers.

As Built to Fail argues,

- we must recognize projects as an assemblage of multiple production systems and use operations science to understand and influence their behavior and thus improve project outcomes.
- the Taylorist preoccupation with squeezing as much work out of workers as possible is counterproductive. Having "materials waiting on workers" is avoided at all costs over "workers waiting on materials," but we don't need to choose between these two options. When it comes to supply, we can replace "just in case" (stacking up inventory) with "just in time" (delivering supplies when and where they are needed).
- the separation of design from construction and the fallacy that design is a phase that can be "finished" has contributed to the problem. Design is an ongoing process through the life of the project.
- deployment is changing from a centralized model to a decentralized one: instead of a project situated in one location, headed by one design firm and a single lead contractor and regulated by one permit, we must contend with multiple locations and jurisdictions, governed by numerous permits, various suppliers, and a multiplicity of design firms.
- the future is autonomous and digital. Yet few construction firms really know how to utilize this technology. Built to Fail explains how AI and machine learning along with IoT, can be fused with operations science and data science to jump ahead of the pack.
展開看更多

作者介紹

TODD ZABELLE has dedicated his professional life to designing and building things. As the founder of several successful companies and a cofounder of the Project Production Institute, Zabelle is an internationally recognized leader in improving construction. His current company, Strategic Project Solutions Inc., has worked with some of the biggest names in both private industry and academia.

Zabelle has published numerous papers in technical journals on optimizing engineering, fabrication, and construction and presented at many conferences around the world. His work has been cited by notable authors and industry luminaries and earned him recognition in UK's Rethinking Construction in 1998, prepared for the then deputy prime minister.

規格

誠品貨碼 /
ISBN13 / 9798887501581
ISBN10 /
EAN貨碼 / 9798887501581
裝訂 / H:精裝
頁數 / 288
語言 / 3:英文
級別 / N:無
尺寸 / 23.1X15.2X3.0CM
重量(g) / 521.6

退貨說明

退貨須知:

  1. 依照消費者保護法的規定,您享有商品貨到次日起七天猶豫期(含例假日)的權益(請注意!猶豫期非試用期),辦理退貨之商品必須是全新狀態(不得有刮傷、破損、受潮)且需完整(包含全部商品、配件、原廠內外包裝、贈品及所有附隨文件或資料的完整性等)。
  2. 請您以送貨廠商使用之包裝紙箱將退貨商品包裝妥當,若原紙箱已遺失,請另使用其他紙箱包覆於商品原廠包裝之外,切勿直接於原廠包裝上黏貼紙張或書寫文字。若原廠包裝損毀將可能被認定為已逾越檢查商品之必要程度,本公司得依毀損程度扣除回復原狀必要費用(整新費)後退費;請您先確認商品正確、外觀可接受,再行拆封,以免影響您的權利;若為產品瑕疵,本公司接受退貨。

依「通訊交易解除權合理例外情事適用準則」,下列商品不適用七日猶豫期,除產品本身有瑕疵外,不接受退貨:

  1. 易於腐敗、保存期限較短或解約時即將逾期。(如:生鮮蔬果、乳製品、冷凍冷藏食材、蛋糕)
  2. 依消費者要求所為之客製化給付。(如:客製印章、鋼筆刻字)
  3. 報紙、期刊或雜誌。
  4. 經消費者拆封之影音商品或電腦軟體。
  5. 非以有形媒介提供之數位內容或一經提供即為完成之線上服務,經消費者事先同意始提供。(如:電子書)
  6. 已拆封之個人衛生用品。(如:內衣褲、襪類、褲襪、刮鬍刀、除毛刀等貼身用品)
  7. 國際航空客運服務。

若您退貨時有下列情形,可能被認定已逾越檢查商品之必要程度而須負擔為回復原狀必要費用(整新費),或影響您的退貨權利,請您在拆封前決定是否要退貨:

  1. 以數位或電磁紀錄形式儲存或著作權相關之商品(包含但不限於CD、VCD、DVD、電腦軟體等) 包裝已拆封者(除運送用之包裝以外)。
  2. 耗材(包含但不限於墨水匣、碳粉匣、紙張、筆類墨水、清潔劑補充包等)之商品包裝已拆封者(除運送用之包裝以外)。
  3. 衣飾鞋類/寢具/織品(包含但不限於衣褲、鞋子、襪子、泳裝、床單、被套、填充玩具)或之商品缺件(含購買商品、附件、內外包裝、贈品等)或經剪標或下水或商品有不可回復之髒污或磨損痕跡。
  4. 食品、美容/保養用品、內衣褲等消耗性或個人衛生用品、商品銷售頁面上特別載明之商品已拆封者(除運送用之包裝外一切包裝、包括但不限於瓶蓋、封口、封膜等接觸商品內容之包裝部分)或已非全新狀態(外觀有刮傷、破損、受潮等)與包裝不完整(缺少商品、附件、原廠外盒、保護袋、配件紙箱、保麗龍、隨貨文件、贈品等)。
  5. 家電、3C、畫作、電子閱讀器等商品,除商品本身有瑕疵外,退回之商品已拆封(除運送用之包裝外一切包裝、包括但不限於封膜等接觸商品內容之包裝部分、移除封條、拆除吊牌、拆除貼膠或標籤等情形)或已非全新狀態(外觀有刮傷、破損、受潮等)與包裝不完整(缺少商品、附件、原廠外盒、保護袋、配件紙箱、保麗龍、隨貨文件、贈品等)。
  6. 退貨程序請參閱【客服專區→常見問題→誠品線上退貨退款】之說明。
付款/配送